Driveway Installation Process

From groundworks to handover

The visible finish is only the final part of a driveway. Long-term performance depends heavily on preparation, drainage, restraint and workmanship.

  1. 01

    Survey and specification

    Measure the area, inspect access and levels, identify utilities, agree drainage and define the construction in writing.

  2. 02

    Excavation

    Remove the existing surface and unsuitable ground to the required formation level while protecting buildings, services and boundaries.

  3. 03

    Sub-base preparation

    Install and compact the specified aggregate in suitable layers. Soft areas may need additional treatment or excavation.

  4. 04

    Drainage and levels

    Form falls, install channels or infiltration components, and ensure water is directed to an appropriate destination.

  5. 05

    Edging and restraints

    Set kerbs, borders and edge restraints accurately so the finished surface is contained and levels remain stable.

  6. 06

    Surface installation

    Lay the chosen blocks, asphalt, resin, gravel or concrete to the relevant system and workmanship specification.

  7. 07

    Compaction and finishing

    Compact where required, complete joints and details, clean the site and protect the new surface during curing or settling.

  8. 08

    Handover

    Explain use restrictions, maintenance, guarantees, drainage care and what to do if a defect appears.

Ask for a written specification

A quotation should identify the surface, approximate area, excavation, sub-base, drainage, edging, waste removal, VAT, payment schedule and guarantee.